Opened in 2005, Electrical and Mechanical Services Department Headquarters was converted from the Former Hong Kong Air Cargo Terminal 2 Building. The 7-storey building occupies an area of 80,000 sq m, and is equipped with a variety of environmental-friendly facilities. The steel-like exterior wall and glass curtain entrance gives the building a modern outlook. The lobby is illuminated with natural light and designed for a contemporary style with an imposing high ceiling and automatic doors. The headquarters building has a spacious forecourt area, and the vehicular access is planted with palm trees to create greenery. There is a footbridge on the right side of the entrance connecting the headquarters with adjacent buildings. The design of the building won the Hong Kong Institute of Architects Merit Award 2004.
Send in the application form to relevant department(s) via the Film Services Office with information on the location, date, time, synopsis of the film, description of the scenes, size of the crew and cast, number of vehicles and use of government power supply and equipment required.
Processing time : 14 working days.
$6,870 (basic charge) for the first 4 hours, $1,935 for each subsequent 4-hour block and a refundable deposit equal to the fees payable. Both are to be paid before filming.
If extra government personnel is required to facilitate the filming, the actual cost plus overheads will be charged.
Applicants shall effect adequate public liability insurance at their own expense in the joint names of the Government of the HKSAR.
Compliments to the government and public bodies that have agreed to consider applications to hire premises or facilities under their management for location filming.